EasyManua.ls Logo

BMS alpha CR - Feeder;Scraper Filling and Water Adjustment

Default Icon
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Work mode
7.7
Operation in working mode
104
18. Add the required quantity of binder and aggregates according to the
finished product requirement via the hopper.
19. Add the required quantity of water to the mixing and delivery vessel.
20. Swivel the feeder upwards again via the "Raise/lower feeder" lever.
21. Fill the mixing and delivery vessel with the remaining sand and gravel
up to the lower edge of the filling dome.
22. Swing the feeder down again using the "Raise/lower feeder" lever.
The feeder can be refilled during the mixing and delivery time.
23. Check the consistency and top up with water if necessary.
24. Fold the hopper back and clean the edge of the dome.
25. Close the dome cover (see Section 7.7.2).

Table of Contents