M88-E01072 4 - 1
4. Hardware Installation for the D8
ADVANCE
This section describes hardware installation for
a D8 ADVANCE.
4.1 Servicing Precautions
When the equipment is connected to the mains
supply, some terminals, components, and
multiple power supply lines may be live. It is not
sufficient to just press the D8 enclosure’s Power
OFF button (O) or the on/off power switch on the
VÅNTEC-1 controller. The mains supplied to the
system must be switched off externally.
Components attached to the goniometer will
move during operation. Use proper lifting
methods for the detector controller and the
detector components.