Hardware Installation for the D8 ADVANCE VÅNTEC-1 Detector User Manual
4 - 2 M88-E01072
4.2 Shipping and Unpacking
1. Check for external shipping damage to the
packages.
2. Open the boxes containing the detector and
its components.
3. Check for any damage to the components.
4. Inventory all items for completeness.
5. Save the packaging when practical for
return shipping.
4.3 Baseline Data
Before making any installation or calibrations to
the diffractometer, run and save a standard
Bragg-Brentano scintillation scan using the set-
tings in Table 7.1 or Table 7.2. The data file will
be the baseline for comparison of the data col-
lected using the VÅNTEC-1 controller. The
baseline data should be collected with a stan-
dard reference material (SRM) like the NIST
1976 corundum plate (see the Instrument Verifi-
cation Booklet M88-Zxx041 for additional sys-
tem parameters).