EasyManua.ls Logo

Cisco 1240 - C H a P T E R 12 Installing Battery Backup Units; BBU Status

Cisco 1240
216 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12-2
Cisco 1240 Connected Grid Router Hardware Installation Guide
OL-26223-04
Chapter 12 Installing Battery Backup Units
Battery Backup Units
The BBU internal components include battery cells, a primary protection circuit, a fuel gauge, and a
charger. For detailed, illustrated descriptions of the BBU, see the “BBU Components” section on
page 12-5.
Figure 12-1 Battery Backup Units Mounted on Router Door
BBU Status
The BBU is automatically enabled and begins supplying power to the router when the router detects that
power is not being received from the AC power supply. The BBU continues to supply power to the router
until at least one of the following conditions is met:
All BBUs are completely discharged
AC power to the router is enabled
The BBU battery cable is disconnected from the router
The BBU is disabled with software commands (see the “Related Commands” section on page 12-23)
Item Cisco Product ID (PID) Description
1 CGR-BATT-4AH Battery backup units. The router supports up to three BBUs, as
shown here.
300558

Table of Contents

Related product manuals