EasyManua.ls Logo

Cisco 1240 - ETH Leds-Fast Ethernet Interface Status; SFP Leds-Combo Port and SFP Port Status

Cisco 1240
216 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-4
Cisco 1240 Connected Grid Router Hardware Installation Guide
OL-26223-04
Chapter 14 Router LED Locations and States
LED Locations and State Descriptions
ETH LEDs—Fast Ethernet Interface Status
SFP LEDs—Combo Port and SFP Port Status
The ETH 2/1 and ETH 2/2 interfaces are shared. Each interface (ETH 2/1 and ETH 2/2) supports either
a fiber optic GE connection (using an SFP module) or a copper GE connection, but not both. For more
information, see the “Combo Ports” section on page 3-25.
Fast Ethernet LEDs
LED Label Color and State Description
ETH 2/3
ETH 2/4
ETH 2/5
ETH 2/6
Off No link established
Green solid Ethernet link established
Amber, 2 blinks/pause 10 MB/s link speed
Amber, 1 blink/pause 100 MB/s link speed
Combo Port LEDs–SFP Module and Gigabit Ethernet Ports
LED Label LED Label Color and State Description
ETH 2/1
ETH 2/2
SFP_EN–This LED is active only for fiber optic (SFP module) connections on the ETH 2/1
and ETH 2/2 ports.
Off No SFP installed in the port
Green solid Supported SFP installed in the SFP port
Green blinking SFP module can be removed or replaced
Amber solid Unsupported SFP installed in the SFP port
SFP_SPD–This LED is active only for fiber optic (SFP module) connections on the ETH
2/1 and ETH 2/2 ports.
Green, 3 blink/pause 1000 MB/s link speed
Green, 2 blinks/pause 100 MB/s link speed
Off No SFP link established on the optical GE port
LNK/SPD–This LED is active only for copper GE connections on the ETH 2/1 and ETH
2/2 ports.
Amber, 3 blinks/pause 1000 MB/s link speed
Amber, 2 blinks/pause 100 MB/s link speed
Amber, 1 blink/pause 10 MB/s link speed
Green solid Ethernet cable connected and link established
Off No link established

Table of Contents

Related product manuals