FINAL ASSEMBLY
NOTE
Additional bracing to the building may be necessary to ensure a rigid and square assembly.
1
40
) Once all enclosure walls are erected, ensure that the enclosure is level and square to
) Fasten the tower return walls to the channels mounted to the tower, using the #10 self-
tapping screws provided; pilot holes of m) diameter are accessible through the
b) On pitted applications, fasten the aluminum slotted angles to the floor, enclosure
side, and back walls, using enough anchors. See Figure # 25.
itself and to the platform. Verify all dimensions with site and enclosure drawings and
adjust, as required.
2
1/8" (3 m
slotted holes in the back of the channels.
3) a) On pitted applications, fasten the aluminum enclosure pit frame to the pit floor, using
enough anchors in the holes and slots provided. See Figure # 25.
Figure # 25 Enclosure Pit Frame (Mounted in Pit)