EasyManuals Logo

DAELIM S-FIVE Service Manual

DAELIM S-FIVE
185 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
6-3
ENGINE REMOVAL/INSTALLATION
U NUT
ENGINE
HANGER LINK
Check the following after the engine is assembled.
-Electric systems.
-Adjust of the rear brake free play.
-Inspection of the throttle cable operation.
-Inspection of the oil pump cable operation.
ENGINE HANGER LINK REMOVAL
Remove the luggage box. (3-3 )
Remove the center cover. (3-3 )
Loosen the frame U-nut.
Remove the frame flange bolt.
Remove the engine hanger link.
Install in the reverse order of removal.

Table of Contents

Other manuals for DAELIM S-FIVE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DAELIM S-FIVE and is the answer not in the manual?

DAELIM S-FIVE Specifications

General IconGeneral
Fuel SystemCarburetor
Front SuspensionTelescopic Fork
Front BrakeDisc
Rear BrakeDrum
Tires (Front)120/70-12
Tires (Rear)130/70-12
Engine Type4-Stroke, Air-Cooled
TransmissionAutomatic
Fuel Capacity5.5 liters

Related product manuals