Air
System
Page
11-14
Exhaust
System
and intake Manifold
DODGETurbo
Diesel
install
the gasket and cover.
Install
the fuel heater ground wire.
Torque
Value: 12 N-m [110 in-lbs]
3
capscrew
holes are drilled through
I. Apply liquid teflon sealant to the
m [18 ft-lbs] *
5/16 Inch, 10mm, 3/8 inch
Install
the intake manifold heater power supply connections.
Assemble
the intake piping and intake manifold heater.
Install
the
throttle
control bracket and connect the intake
manifold heater ground wire. Install the
throttle
rod to the
throttle
lever.
Torque
Value:
• Intake manifold heater power supply -14 N-m [10 ft-lbs]
• Intake
crossover
tube
capscrews
- 24 N-m [18 ft-lbs]
• Hose clamps - 5 N-m [44 in-lbs]