EasyManua.ls Logo

Doosan DISD SD 310 - Page 356

Doosan DISD SD 310
696 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Squeeze in and engage rectangular rings (1).
Install O-Ring (2).
NOTE ;
Crease and align rectangular rings centrically.
Install stud bolts, see Arrows !
NOTE :
Secure the stud bolts with Loctite (Type-No. 270) !
Heat housing bores (about 90° C).
( S ) Hot-air blower 220 V 5870 221 503
( S ) Hot-air blower 110 V 5870 221 501
Thread up axle (compl.) until contact is obtained.
SPC000007 Transmission and Torque Converter
Page 128
Figure 155
Figure 156
Figure 157
Figure 158

Table of Contents

Related product manuals