Do you have a question about the Dover Wayne Select S1 and is the answer not in the manual?
Overview of Wayne Select S1 Compact Electronic Dispensers covered in the manual.
Describes the different models of Wayne Select S1 dispensers.
Explains the format for model numbers and their components.
Provides detailed specifications and application information for the dispensers.
Discusses the importance of adhering to all applicable codes for installation.
Outlines critical safety measures for installation and maintenance.
Details considerations for installing dispensers with alternative fuels.
Specific guidelines for installing Diesel Exhaust Fluid dispensers.
Instructions for installing dispensers in existing sites.
Covers requirements for physical installation, anchoring, and site layout.
Procedures for inspecting delivered equipment for damage or loss.
Illustrates a common site layout for dispenser installation.
Comprehensive guide to electrical wiring requirements, connections, grounding, and conduit.
Instructions for installing hoses and accessories for gasoline and diesel fuels.
Specific instructions for installing hoses and accessories for DEF.
Checklist for verifying correct installation before initial operation.
Detailed steps for configuring dispenser software using the IRC.
Includes bleeding product lines and initial product delivery.
Procedure for removing air from product lines to prevent dispenser damage.
Steps for the initial dispensing of product after installation.
Procedures for verifying and calibrating the fuel meter for accuracy.
Procedure for testing incoming voltage to the dispenser.
Final checks and tasks to complete the installation process.
Instructions for registering the equipment for warranty service.
Essential safety information for operating the dispenser.
Step-by-step guide on how to dispense product from the unit.
Explains the different displays and status messages on the unit.
Information about the non-resettable electromechanical totalizer.
Procedures for restarting the dispenser after a power interruption.
Steps to clear dispenser faults by cycling power.
Accessing and viewing dispenser statistics and diagnostic information.
Routine checks and tasks to ensure proper dispenser performance.
Procedures for maintaining strainers and filters for gasoline/diesel.
Maintenance procedures for strainers and filters on DEF dispensers.
Guidelines for cleaning the dispenser and preventing corrosion.
Notes on meter maintenance and accuracy checks for Weights & Measures.
Information on obtaining service and support for the dispenser.
Lists electrical specifications and current ratings for various components and options.
Provides a comprehensive wiring diagram for connecting dispenser components.
Detailed wiring diagram for the pulse output interface option.
Identifies components and connections on the pulse output interface board.
Introduction to data connections for payment terminals and controllers.
Important general notes regarding wiring and connections for terminals.
Illustrates various site configurations involving payment terminals.
Diagram for direct wiring between dispenser and controller using current loop.
Wiring diagram for connecting dispenser to Fusion UDB replacement.
Diagram for connecting dispenser to a data distribution cabinet.
Wiring layout for multiple dispensers using a single data cabinet.
Wiring layout for multiple dispensers using two data cabinets.
Wiring details for payment terminals using RS485 to the controller.
Instructions and considerations for establishing an Ethernet connection.
Introduction to the dispenser's software features and navigation.
Steps for accessing dispenser functions and statistical data.
Explanation of commands used with the Infrared Remote Control.
Procedure for modifying dispenser settings via sub-functions.
Steps for resetting specific statistical totals on the dispenser.
How to exit functions, statistics, or use quick exit features.
Configuration settings for the pulse output interface option.
Comprehensive list of available statistics and diagnostics.
Table mapping models to their respective meter numbers.
List of all configurable functions and their default settings.
Overview of standalone operation and its requirements.
Steps to configure the dispenser for standalone mode from pulse output.
Steps to configure the dispenser for standalone mode from serial mode.
Introduction to the Weights & Measures mode and its purpose.
Navigating the primary categories within the Weights & Measures menu.
Viewing existing units of measure, meter types, and event logs.
Displaying pulse output type, rate, and logged events.
Shows ATC status, events, and probe/fuel assignments.
Information on product pressurization status and events.
Displays software versions and events related to program changes.
Shows volume totalizers for the side that was used in W&M mode.
Covers dispenser settings that may impact operation and metrology.
Detailed definitions for metrological configuration parameters.
Procedures for testing the ATC feature and verifying accuracy.
Overview of the iX Fleet system for controlling S1 dispensers.
Details the power requirements for the iX Fleet system.
Guidelines for installing and connecting Ethernet cables for the iX Fleet system.
Instructions for setting up communication loop termination on the R2 board.
Overview of the bezel security feature for the iX Fleet option.
Explains the different secure access modes available.
Information on loading bezel options and templates.
Table of sub-functions related to bezel security configuration.
Step-by-step guide to enable security mode and load desired settings.
Procedures for clearing a security breach and restoring operation.
Procedures for temporarily disarming the dispenser for maintenance.
Procedure for testing the security hardware switches.
General information and paper recommendations for the T7 receipt printer.
Explains the meaning of indicator lights and the control button.
Step-by-step instructions for replacing the printer paper roll.
Procedures for clearing paper jams from the printer.
Diagrams illustrating the internal wiring of basic S1 dispensers.
Wiring diagrams and connector details for iXFleet systems.
Procedures and timelines for registering equipment for warranty service.
Definitions of terms used in the warranty registration process.