EasyManua.ls Logo

Eckold KF 170 PD - Unpacking and Setup

Eckold KF 170 PD
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Kraftformer KF 170 PD
2018-05-09 | ECKOLD AG
Transport / Set up
4.7 Degree of Disassembly
The following work must be carried out in order to create operational conditions:
1. Set up of the machine (see page 22)
2. Connection / Assembly (see page 31)
Follow all instructions in the respective sectors.
Immediately check the completeness of the delivery upon receipt. Compare the range of
delivery with the enclosed delivery documents. Possible transport damages and/or missing
parts must be reported immediately in writing.
4.6 Delivery contents
iIMPORTANT
Tools are not part of the product's delivery scope. However, tools can be part of the
delivery scope of the delivery order.
Kraftformer KF 170 PD Operating instructions
and tool catalogue,
Instructions for unpacking
1 Grease gun
1 Hexagon srew driver
DIN 911, SW5
1 piece Fork wrench
SW 17 DIN 894
1 piece Fork wrench
SW 24 DIN 894
(only for delivery
KF 170 PD with stand)

Table of Contents