417101774_EMP_KKS_E60_E.doc - 16 - Rev. 8-03.10
7.2.2 Connector assignments of Slot I (3-terminal)
input for low-level advance warning and empty report
Fig. 7.9
1: Low-level advance warning
3: Empty report input
4: GND (
┴
)
(plug assignments: see also chapter 14.5.1 “Technical Specifications“)
7.2.2.1 Installing the suction pipe with low-level advance warning and empty report
# When using a suction pipe, remove the dummy connector and mount the suction pipe
connector.
)
NOTE
Slot I must always be assigned, either through the mounted strapping plug (protective cap
with corresponding symbol; see chapter 7.2.1, Fig. 7.8, Pos. I) or through connection to the
empty report device.
The setup of low level contact is invertible. (see chapter 10.3.8 “Configuration Low level
contact“)
Fig. 7.10