Piping General Arrangement
53 Liebert
®
CW
™
System Design Manual
5.0 Piping
5.1 Piping General Arrangement
Figure 5-1 Piping general arrangement, downflow, CW026 – CW114
Chilled
Water
Return
Chilled
Water
Supply
Shut*
Off
Valves
Hose*
Bibs
Valve
Actuator
A
B
AB
Bleed
Valve
3-Way
Chilled
Water
Valve
Air Flow
Chilled
Water
Coil
3-WAY VALVE
Chilled
Water
Supply
Chilled
Water
Return
Shut*
Off
Valves
Hose*
Bibs
Valve
Actuator
2-Way
Chilled
Water
Valve
Bleed
Valve
Air Flow
Chilled
Water
Coil
2-WAY VALVE
Flow
Switch
(Optional)
Ball
Valve
(Optional)
Ball
Valve
(Optional)
FACTORY PIPING
FIELD PIPING
*Components are not supplied by Liebert but
are required for proper circuit operation
and maintenance.
DPN001657
Pg. 1 Rev. 3