4.6.2 Installation - X-STREAM XEXF Field Housings
Installing cable glands with shielded cables
3. Feed cable through
dome nut and clam-
ping insert
4. Fold braided shield
over clamping insert
5. Make sure that brai-
ded shield overlaps
the O-ring by
3
⁄32“
(2 mm)
1. Strip the cable
2. Expose braided
shield
6. Push clamping insert
into body and tighten
dome nut
7. Assemble into housing
and you´re done!
All signal cables are connected to screw-type
terminals located inside the housing. Access
to the internal components is gained by re-
leasing the two fasteners at the top of the unit
and opening the front panel downwards.
All cables must be fed through cable glands
and secured with a gland nut.
Preparation of signal cables
Signal in- and outputs
Properly installed, the glands act as a strain
relief and guarantee EMC (electromagnetic
compatibility):
Gas connections
Gas connections
Max number 8
Max for purging (incl. / separate) 2 incl.
Material PVDF; stainless steel (opt.)
Sizes 6/4 mm;
1
⁄4"