Installation
4.6.2 Installation - X-STREAM XEXF Field Housings
ELECTRICAL SHOCK HAZARD BY MISSING EARTHING CONDUCTOR
Before completing the electrical connection of the instrument, verify cables
are inserted and connected in correct manner!
Ensure the earthing conductor (protective earth; PE) is connected!
After all connections are correctly made and
checked,
• close the front panel and secure with the
two fasteners.
To achieve best and proper
measuring results you must en-
sure the gas path system does
not have leaks.
For this reason we recommend to carry out a
leak test, as it is described within
„Chapter 7
Maintenance and other procedures“.
Completing the installation process