EasyManua.ls Logo

Emerson X-STREAM XE - Page 412

Emerson X-STREAM XE
536 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Emerson Process Management GmbH & Co. OHG8-42
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2012
8.4 Troubleshooting on Components
Step 5:
To adjust the physical span:
Apply span gas to the analyzer.
Do not disconnect the DVM:
P4.5 Raw signal (+)
P4.15 Bridge voltage (-); GND
CAUTION!
Do not short-circuit pins!
Adjust the voltage to 10V
utilizing R119.
If 10V is not within the adjustable
range, it is necessary to change the
signal amplication with solder bridge
LB3:
Step 6:
Now once more check the zero point:
Apply zero gas to the analyzer.
Do not disconnect the DVM:
The voltage should be 0 V ± 500 mV.
If it does not, repeat from step 3!
P4.15
P4.5 Raw
For an amplication
factor of
close
20 1-5
150 3-5
300 4-5
500 2-3-4-5
LB3
R119
P4

Table of Contents

Related product manuals