Epson DFX 9000 Revision B
Disassembly and Assembly DV ROLLER UNIT 184
18. Remove the E-ring that secures the right end of the Nip roller shaft
R, and remove the Nip gear R2.
19. Remove the E-ring that secures the Collar to the Nip roller shaft R,
and remove the Collar.
20. Remove the E-ring that secures the right end of the OC shaft, and
remove the OC gear 1 and OC Bearing R.
Figure 4-64. DV ROLLER R ASY Removal (5)
OC shaft
Nip roller shaft R
OC Bearing R
20)-2
E-ring
20)-1
E-ring
18)-1
20)-3
Collar
18)-2
Nip gear R2
19)-1
E-ring
19)-2
OC gear1