EasyManua.ls Logo

Epson T-B Series

Epson T-B Series
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation 2. Installation
T-B series Rev.1 5
2.2 Unpacking
Unpacking of the Manipulators and robotic equipment shall be performed by personnel who
has taken robot system training held by us and suppliers and should conform to all national
and local codes.
Please read “Safety Manual” before installing the robot system or before connecting cables
and check the safety considerations.
2.3 Transportation
2.3.1 Transportation Precautions
Transportation of the Manipulators and robotic equipment shall be performed by personnel
who has taken robot system training held by us and suppliers and should conform to all
national and local codes.
Please read “Safety Manual” before installing the robot system or before connecting cables
and check the safety considerations.
2.3.2 Holding Position and Number of People to Transport
Manipulator
Holding position when transporting: Under arm #1 or bottom of base*
* When holding the bottom of the base by hand, be
very careful not to get your hands or fingers caught.
The number of people to transport: At least two
Prohibited part to hold: Power unit
Power unit
Arm #1
(Illustration: T3-B401S)

Table of Contents

Other manuals for Epson T-B Series

Related product manuals