EasyManua.ls Logo

Equipment Technologies APACHE AS1010 - Daily; Grease Boom

Default Icon
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LUBRICATION AND MAINTENANCE
5-6
Daily
The following services must be performed daily, before operation of the Apache Sprayer.
Clean or Replace Primary Engine Air Filter as needed. See “Clean or Replace Engine Primary Air
Filter” on page 5-18.
Grease Boom
The boom is equipped with seven sets of grease fittings. Apply an ample amount of lithium grease
through each of the grease fittings.
Boom Stabilizer
There are two upper (1) and two lower (2)
boom stabilizer grease fittings.
1. Boom Stabilizer
2. Boom Tilt
3. Boom Fold
4. Boom Rack
5. Boom Tip
6. Boom Inner Breakaway
7. Boom Outer Breakaway
(if equipped)

Table of Contents