9.5.5 Analog Inputs Verification (If Connected)
Verify the analog inputs only if they are used. For the verification procedure, see
Section 4.2.8.
9.5.6 Analog Outputs Verification (If Connected)
Verify the analog outputs only if they are used (connected to a SCADA system).
For the verification procedure, see Section 4.2.9.
9.5.7 Sensor Tests
The Hydran M2-X’s sensor test is automatically performed twice a month (the first
and fifteenth days of the month, at midnight). The results are recorded in the Service
history file.
9.5.8 RS-232 Communications Verification
Follow the procedure described in Section 5.2.3.3.
Note: Skip this step if a laptop is used for the present verification process.
9.5.9 RS-485 Communications Verification (for a Network)
If the Hydran M2-X is not polled regularly or if the last monitoring indicates that
one or more units do not answer, follow the procedure described in Section 5.2.3.3.

Table of Contents

Other manuals for GE Hydran M2-X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Hydran M2-X and is the answer not in the manual?

GE Hydran M2-X Specifications

General IconGeneral
BrandGE
ModelHydran M2-X
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals