4.5 Commissioning
1. Wait at least two hours for the Hydran M2-X to stabilize.
2. To verify the reading accuracy of the Hydran M2-X, compare the reading(s)
with a recent dissolved gas analysis (DGA).
3. Log the following information and keep it in a safe place:
The serial number of each component of the network
A general description of the installation (transformer number, power
station number, etc.).
The installation of the Hydran M2-X is now completed. If properly installed and
maintained, the Hydran M2-X provides many years of trouble-free service.
Note: Proper adjustment of trend alarm requires an observation period of trend
behavior to determine the optimal setting. See Section 6.2.5.4.
CAUTION
Gasket must be
properly in place
1. Put cover back in place.
2. Insert the four (4) screws with flat washers and split
lock washers. Using supplied Hex key tool, tighten
the screws one by one diagonally.

Table of Contents

Other manuals for GE Hydran M2-X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Hydran M2-X and is the answer not in the manual?

GE Hydran M2-X Specifications

General IconGeneral
BrandGE
ModelHydran M2-X
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals