EasyManua.ls Logo

GE LOGIQ 400 - Page 323

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
RENEWAL PARTS
6–193
REV 9
6–2–74 HDD Assy (FRU No. 523), HDD Holder Assy (FRU No. 524) (continued)
3.5–Inch HDD Disassembly (continued)
Note
Before installing new 3.5–inch HDD Assy, make sure that the jumper switches located at the bottom
of new 3.5–inch HDD are set properly and the terminator module IC is NOT mounted on RP1 as
shown in ILLUSTRATION 6–107. If the terminator module IC is installed on the 3.5–inch HDD, re-
move it out of the IC socket.
Fujitsu M1603SA
BOTTOM VIEW OF 3.5–INCH HDD
ILLUSTRATION 6–107
Note
The setting of jumper switches for the new 3.5–inch HDD Assy (Quantum Fireball 1280S) is differ-
ent from the old one. Refer to ILLUSTRATION 6–108 to check and set the jumper switches properly.
Quantum Fireball 1280S
BOTTOM VIEW OF 3.5–INCH HDD (b)
ILLUSTRATION 6–108

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals