EasyManua.ls Logo

GE LOGIQ 400 - Page 377

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
RENEWAL PARTS
6–247
REV 9
6–3–2 Replacement Procedures (continued)
(C) F1 in PS Unit
1. Turn the system power OFF. Follow the OSHA Lockout/Tagout Requirements (29 CFR 1910.147, Direction
46–015902).
2. Remove the Side Cover Left. Refer to 6–2–31 on page 6–127.
3. Remove the Left PS Cover. Refer to 6–2–87 on page 6–218.
4. Remove the Power Control Unit. Refer to 6–2–88 on page 6–220.
5. Turn the cap 90 degrees counterclockwise and remove the defective fuse as shown in
ILLUSTRATION 6–138.
6. Install the new fuse. Make sure that only fuse with the required rated current and of same type is used for
replacement.
7. After replacing Fuse, re-install the Power Control Unit, Left PS Cover, and the Side Cover Left.
FUSE F1 REMOVAL
ILLUSTRATION 6–138

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals