LOGIQ 400 SERVICE MANUAL
RENEWAL PARTS
6–268
REV 9
6–6–4 Procedures (continued)
(C) Installing 3.5–Inch HDD Assy
18. Make sure that the four jumper switch are set as shown in ILLUSTRATION 6–151.
19. Make sure that the Terminator Module IC is not mounted on the 3.5–inch HDD Assy. Refer to
ILLUSTRATION 6–151.
Fujitsu M1603SA
REMOVING CABLES
ILLUSTRATION 6–151
Note
The setting of jumper switches for the new 3.5–inch HDD Assy (Quantum Fireball 1280S) is differ-
ent from the old one. Refer to ILLUSTRATION 6–152 to check and set the jumper switches properly.
Quantum Fireball 1280S
BOTTOM VIEW OF 3.5–INCH HDD (b)
ILLUSTRATION 6–152