DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 394 Section 8-15 - V Nav Roll Stand Assembling or Replacement
Section 8-15
V Nav Roll Stand Assembling or Replacement
The purpose of this section is to describe assembly or replacement of the Roll Stand.
NOTE: Be sure the wheels on the Roll Stand are not locked and move the Roll Stand slowly, with
caution to avoid tip over. DO NOT move with the arm extended.
NOTE: The Roll Stand basket is designed to hold the transmitter, which weighs about five pounds
(2.27 kg). DO NOT overload the basket.
Table 8-395 Manpower / Time and Tools
Manpower /
Time
Tools / PPE
One person /
30 minutes
Refer to: 8-2-5 "Tools needed for servicing the LOGIQ E10" on page 8-6 /
8-2-6 "PPE Required During Service" on page 8-6.
Table 8-396 Preparations and Preparation Links
Preparations - you must perform the following steps
NOTICE
Energy Control and Power Lockout for LOGIQ E10:
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO
VOLTAGE GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
1. Power down the LOGIQ E10.
2. Move the User Interface (Top Console) to its lower position.
3. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
Preparation Links (if you need more information):
• 4-2-4 "Power SHUT DOWN" on page 4-9
• 8-6-3 "Side Cover(s)/Side Air Intake (Filter) inspection / replacement" on page 8-33
Signed
Date
TA G
&
LOCKOUT