EasyManua.ls Logo

GE LOGIQ E10

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 244 Section 8-10 - Casters and Brakes replacement
8-10-6 Pedal Mechanism Cam FRU replacement
Material Safety Data Sheet link for LOCTITE 290:
Copy URL into browser for Healthcare SDS System:
-
http://gensuite.ge.com/geh/ehs/msds/msds.cfm?sno=W.137-337
Table 8-267 Manpower / Time and Tools
Manpower /
Time
Tools / PPE
One person /
30 minutes
Refer to: 8-2-5 "Tools needed for servicing the LOGIQ E10" on page 8-6 /
8-2-6 "PPE Required During Service" on page 8-6.
(Tools):
• Torx driver - T30. Optional Torx L-wrench or Torx socket.
• Open end Wrench, 10 mm.
• Wrench, Box, 10 mm. Optional deep socket.
• Adjustable wrench, 152 mm (6 inches) long (if a longer adjustable
wrench is used, it will contact the floor when trying to turn it.
• Two M5 X 0.8 X 16 mm screws (P/N 46-312358P52) from Box 1 of
the LOGIQ E10 Hardware Kit (P/N 5310019-2).
• LOCTITE 290 (LOCTITE P/N 29031). See:
"Material Safety Data Sheet link for LOCTITE 290:" on page 8-244 to access data
sheet.
LOCTITE 290 can be obtained from Grainger.
• Grainger item number 5E217.
NOTE: An adjustable wrench is deeper than an open end wrench and will secure
the Cam Plate better in this procedure.

Table of Contents

Other manuals for GE LOGIQ E10

Related product manuals