EasyManuals Logo

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #136 background imageLoading...
Page #136 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
4 - 6 Section 4-2 - Functional checks
4-2-3 Power ON/Boot Up
Warnings
NOTE: Do not cycle the Circuit Breaker ON-OFF-ON in less than five (5) seconds. When turning OFF
the Circuit Breaker, the Ultrasound system should de-energize completely before turning the
circuit breaker ON.
DANGER
ALWAYS CONNECT THE ULTRASOUND SYSTEM TO A FIXED POWER SOCKET
WHICH HAS THE PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
CAUTION
SYSTEM REQUIRES ALL COVERS
OPERATE THIS ULTRASOUND SYSTEM ONLY WHEN ALL BOARD COVERS AND FRAME
PANELS ARE SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION,
GOOD SYSTEM PERFORMANCE AND COOLING PURPOSES.
NOTICE
Use only power supply cords, cables and plugs provided by or designated by GE.

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
TouchscreenYes
3D/4D ImagingYes
ApplicationsVascular, Cardiac, Musculoskeletal, OB/GYN
Image StorageUSB, Network
ConnectivityDICOM, Ethernet, Wireless

Related product manuals