8-42 Section 8-4 - System Modules- Replacement Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
4.) Install the MPB Door
5.) Refit the following covers: Lower Front eTower cover, Right Side eTower Cover, Left Side eTower
Cover, and RS Probe Cover.
6.) Install all accessories.
• MPB Door Cover Installation Procedure
• Right Side eTower Cover Installation Procedure
• Left Side eTower Cover Installation Procedure
• Lower Front eTower Cover Installation Procedure
• RS Probe Cover Installation Procedure
• Accessories - Replacement Procedures
Perform the checks listed in PSU Module Replacement Procedure on page 8-217