EasyManua.ls Logo

GEDA AB 650 - Hooking Ropes to Suspension Bracket

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly GEDA
®
SUSPENDED WORKING PLATFORM AB 450 / 650
Assembly and Operating Manual
40 / 96 BL061 GB Edition 04/2016
¾
Open the rope lock (12A) of the
bracing completely.
¾ Guide the guy rope (12) over the
prop (9) and secure it with socket
pins (6).
¾
Rig the guy rope (12) to the
support carrier (8).
¾ Tension the guy rope (12) by
turning the rope lock (12A) so far
that the two socket pins are very
difficult to move.
5.1.2 Hooking the ropes to the suspension bracket
¾ Lay the rope on the roof in an untwisted state.
Uncoiling example with a spindle
¾
Hook the load hook of the drive
rope (13) and safety rope (14) to
the suspension bracket (2) on the
front end of the outrigger.
13 = Drive rope
14 = Safety rope
¾ Mount the approach plate limit switch (15) between the ropes (see
also Chapter 5.7.3).
Antriebs-
seil
Sicherungs-
seil
12A
12
6
9
8
13
14
15

Table of Contents

Other manuals for GEDA AB 650

Related product manuals