EasyManua.ls Logo

Haemonetics ACP 215 - Page 80

Haemonetics ACP 215
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 Preventive Maintenance and Installation
P/N: SM-ACP215-01-EN(AB) Haemonetics
®
ACP-215
®
Service Manual
15.Press NO to stop the centrifuge test and continue to the next step. The
screen displays:
16.Press YES to continue. The screen displays:
17.Press YES to continue.
18.Repeat for the yellow, orange, red, clear, green, and line sensor tubing
screens. The screen displays:
19.Press YES to continue.
20.Repeat for the wash solution, additive solution, and solution air detector
screens.
DE-GLYCEROLIZATION PROTOCOL
Start Disposable Check List
Press YES To Continue
PUMP TIME HYPE NACL ADDI
REAL: 0 0 0 0 0
TARG: 0 56 50 1470 240
Check, Press YES To Continue
BLUE Striped Tubing in BLUE
Valve.
PUMP TIME HYPE NACL ADDI
REAL: 0 0 0 0 0
TARG: 0 56 50 1470 240
Check, Press YES To Continue
BLUE Striped tubing connected to
Hypertonic Solution bag.
PUMP TIME HYPE NACL ADDI
REAL: 0 0 0 0 0
TARG: 0 56 50 1470 240

Table of Contents

Related product manuals