EasyManua.ls Logo

HDG Pelletmaster 15 - Boiler Room; Pellet Bunker

Default Icon
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Planning and installation – Planning the heating system
29
Room height: 210 cm
Space required for installation: 370 cm x 790 cm x 1450 cm
BOILER ROOM
APPLICABLE REGULATIONS Your local building regulations will always apply. In Germany,
individual state regulations on boilers and furnaces also apply.
I
NSTALLATION The heating system can be placed on any level, firm floor. A base is
not necessary. Ensure that it is aligned on a horizontal plane.
To ensure unhindered operation and maintenance of the heating
system, it is imperative that the heating system is installed in
accordance with the specifications of HDG Bavaria and that the
minimum spacing requirements are observed.
Additionally, the limit values of DIN 4109 “Soundproofing in building
construction” are not to be exceeded.
More detailed information can be found in the respective ordinances
of the countries and states.
PELLET BUNKER
DIMENSIONS The size of the pellet bunker depends on the building's annual fuel
requirement. The thermal load is the main criterion here, which will
be determined by a heating engineer.
Caution!
Building regulations may differ from country to country and state to
state.
For this reason, consult a qualified specialist for the planning and
installation of your heating room.
Also observe the requirements of the accident prevention and work
safety regulations of the government safety organisations.
Danger!
Dust explosion due to build up of static charge!
Only qualified electricians certified according to TRBS 1203-1 may
perform work on electrical systems in areas at risk of explosion.

Table of Contents