55
4. Lay the cables (1) for the supply, return and flue gas temperature
sensors, combustion chamber temperature and oxygen sensors,
as well as for the ash removal motor, into the cable channel (2).
5. Hook the left hand cladding into the already pre-mounted shaped
studs on the front and rear cladding of the boiler.
6. Firmly bolt the cover plate of the boiler cable channel (3) to the
left hand cladding of the boiler.
ā The left cladding has been installed.
INSTALLING THE PELLET VACUUM CONTAINER
1. Remove the cover from the vacuum pellet container.
When delivered, the lid of the pellet vacuum container is fitted the
wrong way round in order to protect the suction turbine.
Figure 4/32 - Inserting the seal