EasyManua.ls Logo

HDG Pelletmaster 15 - Page 47

Default Icon
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Planning and installation – Installing the heating system
47
4. Place the boiler in the planned location.
5. Ensure the minimum clearances.
See section “4.1 Planning the heating system”, section “Space
requirements and minimum spacing”.
8. Tilt the boiler slightly to the right.
9. Screw on the plastic feet underneath on the left hand side.
10.Use the plastic feet to align the boiler horizontally.
The boiler has been set up.
Caution!
Danger from suspended loads!
The boiler weighs over 250 kg. If the boiler is dropped during
transport, persons can be seriously injured and the boiler can be
damaged.
Make sure that you use appropriate lifting gear when installing the
boiler.
6. Tilt the boiler slightly to the
left.
7. Screw on the plastic feet (1)
underneath on the right hand
side.
Figure 4/16 - Fitting the plastic feet
1
The plastic feet are found in the enclosed ash box.

Table of Contents