47
4. Place the boiler in the planned location.
5. Ensure the minimum clearances.
✎ See section “4.1 Planning the heating system”, section “Space
requirements and minimum spacing”.
8. Tilt the boiler slightly to the right.
9. Screw on the plastic feet underneath on the left hand side.
10.Use the plastic feet to align the boiler horizontally.
✓ The boiler has been set up.
Caution!
Danger from suspended loads!
The boiler weighs over 250 kg. If the boiler is dropped during
transport, persons can be seriously injured and the boiler can be
damaged.
Make sure that you use appropriate lifting gear when installing the
boiler.
6. Tilt the boiler slightly to the
left.
7. Screw on the plastic feet (1)
underneath on the right hand
side.
Figure 4/16 - Fitting the plastic feet