Preventive Maintenance
Chapter 6: General Procedures
Page 6 - 6 Basic Care™ Bed Service Manual (man336)
Preventive Maintenance Schedule
Table 6-2. Preventive Maintenance Schedule
Function Procedure
Trendelenburg Make sure Trendelenburg and Reverse Trendelenburg operate cor-
rectly.
Lockout controls Make sure each lockout operates correctly.
Brake and steer
(option)
Make sure the brake and steer functions operate correctly. Replace
the caster if necessary.
Individual brake
caster
Make sure the brake operates correctly. Replace the caster if neces-
sary.
Individual
brake/steer caster
Make sure the brake and steer functions operate correctly. Replace
the caster if necessary.
Caster tires Examine the caster tires for cuts and wear. Replace the caster if nec-
essary.
Siderail controls Make sure the switches in the siderails operate correctly.
Siderail Examine the siderail, and make sure it latches correctly and is not
loose. Adjust if necessary.
Pivot points Lubricate all pivot points on the bed.
Power cord and con-
nector
Examine the power cord and connector for cuts, breaks, and pin
retention. Replace if necessary.
Headboard and foot-
board
Examine the headboard and footboard for looseness and general
appearance.
CPR release Make sure the CPR release operates correctly (electric model only).
Battery Replace the batteries every two years. Batteries are lead-acid type,
dispose according to your local regulations.
Electrical Do an electrical leakage test on the bed.
General appearance Repair the paint where necessary. Examine the labels, and replace
them if necessary.