EasyManuals Logo

Hillrom Welch Allyn Connex Spot Monitor Service Manual

Hillrom Welch Allyn Connex Spot Monitor
265 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #80 background imageLoading...
Page #80 background image
2. Place the bezel onto the 6 bosses on the housing.
Accessory Power Management (APM) work surface
This section applies only to devices with an APM stand.
Remove the APM work surface from the stand
Before removing the APM work surface, power down the monitor, disconnect the power and
communication cables from the monitor, and disconnect the power cord from the wall.
1. Using a 3mm hex key, remove the 4 screws from the stand bracket and put them aside.
NOTE Save the screws for reassembly.
2. Lift the APM work surface off the stand.
3. If replacing the APM, remove the battery and put aside for reassembly.
Reassembly notes
Kit item:
105943, APM work surface
74 Disassembly and repair Welch Allyn® Connex® Spot Monitor

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hillrom Welch Allyn Connex Spot Monitor and is the answer not in the manual?

Hillrom Welch Allyn Connex Spot Monitor Specifications

General IconGeneral
BrandHillrom
ModelWelch Allyn Connex Spot Monitor
CategoryMedical Equipment
LanguageEnglish

Related product manuals