Hitachi G1000 - Powering on the Secondary and External Storage Systems; Planned Power Off;On of All GAD Storage Systems; Powering off the Primary, Secondary, and External Storage Systems

Hitachi G1000
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. On the primary and secondary storage systems, verify that the quorum
disks have been disconnected.
raidcom get path -path_grp 1 -IH0
6. Power off the storage system at the secondary site and the external
storage system.
Powering on the secondary and external storage systems
1. Power on the storage system at the secondary site and the external
storage system.
2. Confirm that the primary and secondary storage systems and the external
storage system for the quorum disks do not have any blocked parts.
If any parts are blocked, recover them.
3. Check for SIMs about path blockage, and delete the SIMs.
4. On the primary and secondary storage systems, establish connections to
the quorum disks.
raidcom check_ext_storage external_grp -ldev_id 0x9999 -IH0
5. On the primary and secondary storage systems, verify that the
connections to the quorum disks have been established.
raidcom get external_grp -external_grp_id 1-1 -IH0
6. Confirm that the external volumes of the primary and secondary storage
systems are recognized as quorum disks.
raidcom get ldev -ldev_id 0x9999 -IH0
7. Check for SIMs about quorum disk blockade, and delete the SIMs.
8. Confirm that the pair status of the P-VOLs of the GAD pairs is PSUS(Local)
and that the pair status of the S-VOLs is SSUS(Block).
pairdisplay -g oraHA -fcxe -IH0
9. Wait for more than 5 minutes after completing step 4, and then
resynchronize the GAD pairs from the primary storage system by
specifying the primary volume.
pairresync -g oraHA -IH0
10. Confirm that the pair status of the P-VOLs and S-VOLs of the GAD pairs
has changed to PAIR (Mirror (RL)).
pairdisplay -g oraHA -fcxe -IH0
11. Using the alternate path software, resume I/O from the servers to the
storage system at the secondary site.
Planned power off/on of all GAD storage systems
Powering off the primary, secondary, and external storage systems
1. Using the alternate path software, stop server I/O to the primary and
secondary storage systems.
2. On the primary storage system, suspend the GAD pairs.
pairsplit -g oraHA -r -IH0
Planned outage of global-active device storage systems
7-9
Hitachi Virtual Storage Platform G1000 Global-Active Device User Guide