EasyManua.ls Logo

Hitachi G1000 - Planning Ports

Hitachi G1000
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Specify the topology as follows:
NL/FL_port: Fabric ON and FC-AL
F_port: Fabric ON and Point-to-Point
Related topics
Connection types on page 3-6
Planning ports
Data is transferred from Initiator ports in one storage system to RCU Target
ports in the other system. Once you have identified the peak write workload,
which is the amount of data transferred during peak periods, you can
determine the amount of bandwidth and the number of Initiator and RCU
Target ports required for your system.
The following describes the attributes for the ports on the VSP G1000. For
details on setting port attributes, see the Provisioning Guide for Open
Systems.
Initiator ports: Send remote copy commands and data to the RCU
Target ports on a connected storage system. One Initiator port can be
connected to a maximum of 64 RCU Target ports.
Caution: For Fibre-Channel interface, do not use the LUN Manager
function for defining SCSI paths at the same time that you are adding or
removing remote connections or adding remote paths.
Planning for global-active device
3-9
Hitachi Virtual Storage Platform G1000 Global-Active Device User Guide

Table of Contents

Other manuals for Hitachi G1000

Related product manuals