14.4 TEST RUN / AIR PURGE
Test run is a working mode used when commissioning the installation. Some settings are made to let the installer an easy job. Air
purge function drives the pump in a way for evacuating air bubbles in the installation.
Example for PC-ARFH2E
This menu shows the following test to be launched:
Unit Test Run
Air Purge
Screed Drying
Pump down procedure
After “Test Run”, “Air Purge” or “Pump down procedure” option is selected, the YUTAKI user controller asks for the duration of the
test.
Example for PC-ARFH2E
COMMISSIONING
PMML0575 rev.2 - 03/2022
346

Table of Contents

Other manuals for Hitachi YUTAKI RWM-2R1E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi YUTAKI RWM-2R1E and is the answer not in the manual?

Hitachi YUTAKI RWM-2R1E Specifications

General IconGeneral
BrandHitachi
ModelYUTAKI RWM-2R1E
CategoryAir Conditioner
LanguageEnglish

Related product manuals