EasyManua.ls Logo

Hitachi YUTAKI Series - System Configurations

Hitachi YUTAKI Series
262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controller pack
Service Manual
118
Systemcongurations
SMGB0066 rev.0 - 12/2009
TERMINAL
BLOCK C
TERMINAL
BLOCK C
TERMINAL
BLOCK C
T MIX
T DHW
T RET
T SUP
T EXT
10
9
5
4
3
2
1
15
14

¡
The Heat Pump is sized to provide 100% of the heating requirements on the coldest day of the year. Used in new builds or in
boiler-replacement applications.
• DirectOTCControlledHeatingLoop
• OptionalDHWstoragewithdivertingvalveorpump
Thiscongurationissuitableforlow-temperatureradiatorsandunderoorheatingsystems.
 
• SetinstallerparameterCONFtovalue1
• SetinstallerparameterP1to0(noDHW),1(DHWvalve)or2(DHWpump)
• SetP4(OTCheatingcurve)accordingtobuilding/system
 
•
SetinstallerparameterP2to0(nosecondarypump),1
(secondarypump9,ifbuffertankorhydraulicseparatorisused
•
DHW setpoint and control parameters
•
Minimum and maximum supply temperatures
•
Room temperature compensation
•
Frost Protection parameters
•
Summer switch-off setting
•
Tariff/Timerinputconguration
- Heat Pump
- Optional DHW valve/ pump
- Optional secondary pump
- Optional DHW electric heater

Table of Contents

Other manuals for Hitachi YUTAKI Series

Related product manuals