Unit installation
Service Manual
20
RHUE-(3~6)A(V)HN
SMGB0066 rev.0 - 12/2009
 
 
Foundation shall be on a level surface and it is recommended to be 100-300 mm higher than ground level. -
UseM10anchorboltstoxtheunittothefoundation.(Foundationbolts,nutsandwashersarenotincluded,and -
mustbeeldsupplied).
Drainwatermightturnintoiceoncoldweatherareas.Therefore,wheninstallingtheunitonarooforaveranda, -
avoid the draining on a public area since it may become slippery.
Drain water
900
1250
1450
174
410
440
640
Drain water place
Concrete base
Foundation bolt
Mortar charge
ThewholeofthebaseoftheYutakiunitshouldbeinstalledonafoundation.Whenusingvibration-proofmat,itshould -
alsobepositionedthesameway.WheninstallingtheYutakiunitonaeldsuppliedframe,usemetalplatestoadjust
theframewidthforstableinstallationasshowninbelowgure.
57 mm
Base width of
Yutaki unit
Yutaki unit
is
unstable
Frame
60mm
Frame with
(Field supplied)


Yutaki unit is
stable
57 mm
Base width of
Yutaki unit
Frame
100mm or more
Metal plate
Recommended Metal Plate Size
(Field-Supplied) Material: Hot-Rolled Mild Steel -
Plate (SPHC) Plate Thickness: 4.5 T -