21
RHUE-(3~6)A(V)HN
SMGB0066 rev.0 - 12/2009
Unit installation
Service Manual
1
The foundation drawing shown previously is an example.
Theunitislow-vibrationmodel,butconsiderusingsomeoorreinforcementoranti-vibrationmat/rubberwhen -
vibration should occur due to weakness of attached surface.
Thefoundationshallbeuniedwiththeoorslab.Ifnot,calculatethevibrationproofoftheinstallationofYutakiUnit -
as well as of the Yutaki Unit with the foundation in order to ensure strength against a fall or for when the unit has to
be moved.
Drain water and rainwater are discharged from the bottom of the unit when in operation as well as when stopped. -
Choose a location with good drainage or place a water drain as in the drawing. -
Makethefoundationatandwaterproof,asawaterpoolmayappearincaseof,forinstance,rain. -
Thisisalow-proleproductwithashallowdepth.Itmayalsobeabletoxonthewallasshownbelowwhenxing -
onlywiththefoundationboltdoesnotseemsufcientlystabledependingontheconditionsoftheinstallation.(Metal
ttingsmustbeeldsupplied).
1. Fix the unit onto the wall as indicated
inthegure.(Stayeldsupplied).
2. The foundation shall be strong
enough to avoid any deformation
and vibration.
3. In order to prevent vibration transfer
tothebuilding,placerubbermaterial
between the stay and the wall.
Anti-vibration rubber
(eldsupplied).Apply
when necessary.
Bothsidescanbexedtothewall.
(Metalttingsareeldsupplied)
warning
Crush hazard. Can cause serious injury. -
Installation must ensure that the unit will not incline, vibrate, make noise or fall down by a blast of wind or in -
an earthquake.
Calculate quake-resistance strength to ensure that installation is strong enough against falling. Fix the unit with -
wires (eld supplied) when installing in a location without walls or windbreak and likely exposed to a blast of wind.