EasyManua.ls Logo

Hitachi YUTAKI Series - Page 65

Hitachi YUTAKI Series
262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
63
Accessories electrical installation
SMGB0066 rev.0 - 12/2009
Electrical wiring
Service Manual
3
Theelectricalconnectionoftheloadmeasured(3)totheanode(1),ismadethroughthewiringofconnection(6):
- To the anode: U shaped terminal M10 (4)
- To the load measured: female Faston terminal 2.8 (10)
Theelectricalconnectionoftheloadmeasured(3)totheearth,ismadethroughthewiringofconnection(7):
-To earth: U shaped terminal M10 (5)
- To the load measured: female Faston terminal 6.3 (10)
caution
Check the magnesium anode load periodically by pushing the button. If the gauge is in the red zone, the -
magnesium anode must be replaced.
Do not install the permanent cathode protection and the cathodic protection together. -
¡
6
1
5
2
4
7
8
9
10
3
11
All the Hitachi DHWT can be equipped with the permanent cathode protection system which is totally automatic and
maintenance free.
It basically comprises a titanium anode (1) mounted on the storage tank’s connection plate (2) and connected to a
potentiostat(3)whichautomaticallyregulatestheinputcurrenttotheanode,constantlymeasuringthepotentialofthe
storagetank),throughtheleads(4).Wiringtheanodetothepotentiostatbymeansofleads(4)iscarriedoutinthefollowing
way:
-Totheanode:connection(5),femaleFastonterminal.

Table of Contents

Other manuals for Hitachi YUTAKI Series

Related product manuals