2.7.3 Chemcassette™ Tapes 29
2.7.4 Optional ChemCam 29
2.7.5 Sample Filters 29
2.8 Pyrolyzer Module Detection System 30
2.8.1 Pyrolyzer Fan 30
2.9 Vacuum Pumps 31
2.9.1 Pump Status Indicator 31
2.10 Multiple Gas Monitoring 31
2.11 Control System 32
2.11.1 Data Acquisition Computer 32
2.11.2 Programmable Logic Controller 32
Chapter 3 - Installation 33
3.1 Introduction 33
3.2 Surveying the Installation Site 33
3.2.1 Placement of the Vertex M system 34
3.2.2 Exposure to Dust and Humidity 34
3.2.3 Sample Transport Time 34
3.2.4 Monitor Dimensions 34
3.2.5 Sample Locations 34
3.2.6 Sample Line Particulate Filter Use 35
3.3 Optional Floor Mounting 35
3.4 Installing Sample Lines/Filters 35
3.4.1 Sample Line Installation Requirements 35
3.4.2 Sample Line Connections 36
3.4.3 Installing Sample Line Particulate Filters 37
3.5 Installing Pump Exhaust Line 37
3.5.1 Exhaust Line Installation Requirements 37
3.5.2 Exhaust Line Connection 38
3.6 Electrical Power 39
3.6.1 Connecting AC Power 39
3.6.2 Power On/Off 40
3.7 Data Acquisition System 41
Vertex M 3 User Manual