devices. To prevent damage, observe antistatic precautions.
CAUTION:CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the
server when a port blank is removed without the corresponding I/O port option installed.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack .
5. Remove the access panel .
6. Remove the secondary riser cage.
7. Remove the serial port blank.
Retain the blank for future use.
8. Install the serial port:
a. Insert the serial port into the rear panel opening (callout 1).
b. Install the hex screws (callout 2).
HPE ProLiant ML350 Gen11 Server User Guide 144