EasyManua.ls Logo

HPE ProLiant ML350 Gen11

HPE ProLiant ML350 Gen11
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Install the system battery:
a. With the side of the battery showing the "+" sign facing up, insert the battery into the socket (callout 1).
b. Press the system battery down until it clicks into place (callout 2).
10. Install the secondary riser cage.
11. Install the access panel.
12. Do one of the following:
Orient the server back in tower mode.
Install the server into the rack.
13. Connect all peripheral cables to the server.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server.
17. Properly dispose of the old battery.
For more information about proper battery disposal, contact an authorized reseller or an authorized service provider.
ResultsResults
HPE ProLiant ML350 Gen11 Server User Guide 173

Table of Contents

Other manuals for HPE ProLiant ML350 Gen11

Related product manuals