EasyManua.ls Logo

HPE ProLiant ML350 Gen11

HPE ProLiant ML350 Gen11
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ProcedureProcedure
1. Insert the front bezel hooks to the chassis (callout 1).
2. Close the front bezel (callout 2).
3. While pressing the key against the lock, rotate the key to the lock position (callout 3).
4. (Optional) For later use, store the front bezel keys inside the front bezel.
Install the server into the rackInstall the server into the rack
PrerequisitesPrerequisites
Get help to lift and stabilize the server during rack installation. If the If the serverserver is installed higher than chest level, an additional person is installed higher than chest level, an additional person
might be required to help install the might be required to help install the serverserver:: One person to support the server weight, and the other to slide the server into the rack.
HPE ProLiant ML350 Gen11 Server User Guide 61

Table of Contents

Other manuals for HPE ProLiant ML350 Gen11

Related product manuals