EasyManua.ls Logo

HPE ProLiant ML350 Gen11

HPE ProLiant ML350 Gen11
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Verify the operation of the rack rails:
Two people might be needed for this procedure: one to slide the chassis in and out of the rack, and the other to observe the rear
panel cables and power cords.
a. Fully extend the chassis out of the rack.
b. Check that there is enough slack in the cables and cords for full extension of the chassis. Make sure that there is no cable
binding or crimping.
c. To ensure that the cables and cords are secured properly, slide the chassis in and out of the rack. Make sure that there is no risk
of accidental disconnection of the peripheral cables and power cords.
ResultsResults
The installation is complete.
Installing the shipping hardwareInstalling the shipping hardware
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
Cage nut insertion tool
T-25 Torx screwdriver
Phillips No. 2 screwdriver
About this taskAbout this task
If you intend to transport or ship a rack-mounted server to a new location, make sure that the shipping hardware is installed. The
shipping hardware protects the server from vibration damage that might occur during server shipment.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
HPE ProLiant ML350 Gen11 Server User Guide 83

Table of Contents

Other manuals for HPE ProLiant ML350 Gen11

Related product manuals