10. Connect the drive cables:
Storage controller cable
Drive power cable
11. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs.
This is done to prevent system damage due to cables being inadvertently caught under the fan cage.
12. Install the fan cage.
13. Install the access panel
14. Do one of the following:
Orient the server back in tower mode .
Install the server into the rack .
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server.
19. Install the LFF hot-plug drives .
20. Install the front bezel.
ResultsResults
The installation is complete.
Installing the 8 SFF drive cageInstalling the 8 SFF drive cage
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
About this taskAbout this task
This server supports several front 8 SFF drive cage options with different backplanes This option:
HPE ProLiant ML350 Gen11 Server User Guide 88