EasyManua.ls Logo

Huawei NetCol5000-A - Page 182

Huawei NetCol5000-A
269 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
5 Operation and Maintenance
Issue 01 (2017-07-27)
174
Step 5 Remove the plastic plug from the port of the new filter dryer.
Step 6 Install the new filter dryer, as shown in Figure 5-21.
Secure the filter dryer in the original position. Ensure that the arrow on the filter dryer
points upwards.
Installation of the new filter dryer requires the collaboration of two persons. The torque for
tightening the adjustable nut is 70 N•m.
Figure 5-21 Installing a filter dryer
1. Apply red glue to the third to second last thread circles of the outer screw thread
counting from the pipe outlet inward. Secure the filter dryer nut and pipe nut using two
27# adjustable wrenches respectively. Then tighten the adjustable nut using a 36#
adjustable wrench.
2. Reinstall the hold hoops.
Step 7 Perform a leakage test with nitrogen again.
Step 8 After checking that the air conditioner does not leak, vacuumize the air conditioner and
charge refrigerant by referring to 4 Commissioning.
Step 9 Power on the device and tap Startup on the home screen. Ensure that the air conditioner is
running normally without any alarms.
----End

Table of Contents

Related product manuals