Scenario Operation Start/Shutdown
Signal Status -
LCD/ECC/NetEco
WebUI
Start/Shutdown
Signal Status -
Hardware Port
NOTE
For shutdown commands, the remote start/shutdown signal of the hardware port has the highest priority,
and that of the smart cooling product LCD, ECC WebUI, and NetEco WebUI has the same priority.
If ON/OFF via NMS is disabled on the smart cooling product LCD, the device cannot be started or shut
down over the ECC or NetEco.
Figure 12-1 Start/Shutdown over the LCD
Figure 12-2 Start/Shutdown over the ECC WebUI
Figure 12-3 Start/Shutdown over the NetEco WebUI
NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual 12 FAQ
Issue 08 (2021-09-17) Copyright © Huawei Technologies Co., Ltd. 293